Compliance Infrastructure · Deterministic Execution · UK Solar Installations

Compliance should be invisible.
Failure should be impossible.

CLRD converts structured installation data into regulator-ready DNO documentation — routed, formatted, and audit-defensible across G98, G99, G100, and SLD workflows.

Manual DNO process: 45–70 minutes · CLRD: ~3 minutes

Structured interpretation of regulation into deterministic execution.

Workflows covered
G98 / G99 / G100 / SLD
Documentation errors
0 by design
Status
UK Pilot Active
UK pilot  ·  controlled access

Work with us before full release.

We are working with a small number of professional installers to validate operational workflows before full launch.

UK pilot · Open only to MCS-registered installers
DNO submission is where manual work becomes commercial risk.

Manual routing, ENA checks, DNO templates, and document control slow the job before it reaches the network.

Wrong route. Rejected application.

A G98, G99, or G100 misroute is not just admin. It delays submission, creates rework, and adds cost before the job reaches approval.

G98 / G99 / G100

Manual lookups. Rebuilt documents.

ENA references, DNO formats, export limits, and supporting documents are checked manually job after job. That is where missing data, wrong formats, resubmissions, and cost enter the process.

ENA / DNO / SLD

Audit trail across email and spreadsheets.

Proof matters at audit. Inbox searches, copied templates, and spreadsheet notes do not scale as a compliance trail.

Audit Defensibility

Manual admin becomes commercial risk.

Every misroute, missing reference, rebuilt document, or weak audit trail adds time, cost, and exposure before the submission reaches the network.

Manual DNO admin becomes a recurring labour cost.

Every submission built manually consumes time before the job reaches the network. Adjust the slider to estimate your monthly recoverable admin value, net of the CLRD plan that covers your volume.

The saving is not only the minutes recovered. It is the reduction in rework, delayed submissions, and repeated manual checks across every job — all before any plan cost is deducted.

Jobs per month 50jobs
5100200300400500+
Manual DNO process
45–70 mins / job
CLRD submission workflow
~3 mins / job
Time recovered
35–56 hrs / month
Gross admin value @ £20/hr
£700–£1,120 / month
Recommended plan Workflow
−£124 / month
Net monthly value recovered
£576–£996
The controlled workflow behind every DNO submission.

CLRD controls routing, ENA reference handling, document generation, and audit evidence from one structured workflow before submission.

Routing controlled

The submission pathway is resolved from the job data, reducing reliance on memory, habit, or manual route selection.

Reference data applied

ENA reference data is applied from the selected equipment, removing a repeated manual lookup step from the submission process.

Submission evidence locked

Forms, SLD, declarations, and submission records are produced from the same structured job record and retained as part of the audit trail.

CLRD new job wizard capturing system and site details for a DNO application
CLRD job page showing a G99 SGI-3 route determination and pre-install DNO document pack
Three properties.
No exceptions.
Deterministic.

No judgement calls. No variation between engineers. The same input produces the same correct output, every time. Compliance doesn't depend on who ran the job.

Explainable.

Every routing decision is traceable. You can show exactly why a G99 was filed rather than a G98 — down to the threshold values that triggered the determination.

Audit-first.

Documents are version-stamped and locked at generation. The compliance record is complete before the installer leaves site — not assembled later from memory.

Built from installer reality.
Structured for compliance execution.

CLRD translates direct UK solar installation experience into structured compliance infrastructure — shaped by the operational pressure behind DNO submissions, ENA checks, document control, and the cost of rework.

Currently available through a controlled UK pilot for MCS-accredited installers before full release.

UK installer-led / Controlled pilot access / G98 / G99 / G100 / SLD
Request access to the CLRD pilot.

Open to MCS-accredited UK solar installers who want to reduce DNO admin time, rework, and submission friction.

1 month pilot access
No card required
G98 / G99 / G100 / SLD workflows covered
Suitable for solo installers, teams, and high-volume operators
Founding member pricing locked in at full launch
UK pilot · MCS-accredited installers only · No spam
📞 Prefer to talk?